Thursday, 7 February 2013

Software Testing Training In Pune...


Optimized Infotech Software Testing  Training
If you want to Learn and make a career in Software Testing then, you should attend Optimized InfoTech Software Testing Training. This course will introduce you to the new world of software Testing , with all the concepts and Techniques used in software testing, and Equip you to be a better software Test Engineer , ready to take on any Challenges in the area of Software Testing. This course will also take a cursory look at the Automation and QTP –Automation Tool and Test management Tool like Quality center.

Software Testing:
Duration 40 Hours
 Software Testing:


·         Fundamentals Of Testing.
-Why Testing is Necessary.
-What is Software Testing.
-Definitions and Terminology.
-Testing Principles.
-Common Problems in SDLC.
-Skills Required for  Testing.
-Economics of Testing.
-STLC.
-Entry/Exit  Criteria in Testing.
·         Software Development Life Cycle.(SDLC)
-SDLC
-SDLC Stages.
-PDCA cycle
-Software Process
Models(WaterFall/Prototype/Increamental/RAD/Spiral/V-shaped/Agile etc)
           -Advantages/Dis advantages of Each


·         Quality
-What is Qualty.
-Quality Views.
-Quality Means.
-Quality Productivity.
-Software Quality.
-What is QC(Quality Control)
-What is QA(Quality Assurance).
-QA vs  Qc.

·         Verification and Validation.
-Verification and Validations.(V&V)
-Verification.
-Types of review
-Walkthrough.
-Inspection.
-Review
-benefits of Reviews.
- validation
-Types of Testing.
-Unit Testing/Integration /System /UI/Usablity/Functional/Manual /Non-Functional/Recovery/Compatibility/Configuration/Installation/Performance..etc.
-Smoke Vs Sanity.
-UAT
            -Alpha Vs Beta Testing


·          Black Box vs White Box Techniques.
-Test Methods.
-Black Box Testing (BBT).
-Test  case design Method.(EP/BVA/Error Guessing/UC based/Cause-effect).
-Disadvantages of BBT.
-White Box testing(WBT).
-Statement Coverage/Branch Coverage/Condition coverage.
-Cyclomatic complexity,
-Advantages/Disadvantages of WBT.

·         Test Plan
-Test Plan.
-Preparing a Test Plan.
-Test Plan Template.
-Test scope.
-Item Pass/Fail criteria.
-Suspension/Resumption criteria.
-Test deliverables.
-Staffing and Training needs.
-Schedule/milestones.
-Risks.


·         Test cases.
-Test cases.
-Characteristics of good TC.
-Issues To be considered.
-Structure of TC.
-TC template.
-TC Review
-Review Process.
-TC Execution.

·         Defect Life Cycle.
-What is defect?
-Error –fault-failure.
-Who can report a Defect.
-Priority & severity with examples.
-Defect Report format and content.
-Defect management.
 -Defect submission.
-defect Life cycle.
-Defect density.
-Types of defects.



·          Risk Analysis.
-What is Risk.
-Risk Analysis.
-What risk analysis can do?
-Risk Ranking and Objective.
-Risk Management.
-Risk assessment.
-Risk Mitigation.
-Risk Response.
-Risk Report and Analysis.
 -Risk Mitgation Graph.
·         SCM(Software configuration Mgmt)
-What is CM?
-Why we need CM?
-What does SCM do/
-VCS.
-Version Management Tools.
-Examples and Role.



·         Traceability Matrix.
-What is TM?
-Purpose.
·         Incident Management.
-Incident Management.
-Incidents.
-Incident Lifecycle.
     

·         Web Testing and UI testing.
-Checklist Web testing.
-Checklist for UI testing.
-Functionality Testing.
-Performance Testing.
-usability testing.
-security Testing.
·         Next step:Automation
-Automation.
-Disadvantages of Manual.
-Why Automation Testing.
-benefits of Automation Testing.
-What to Automate.
-When to Automate.
-Selection of Tools.
-Various Tools available.
-Overview of QTP and QC.

.

No comments:

Post a Comment